Acumatica Project Accounting: Setting Up Projects, Budgets and Billing

Last updated: November 10, 2026 · Independent guide · We do not sell rankings or coverage.
Acumatica project accounting is set up in a fixed order: enable the Projects feature, map your general ledger to account groups, build cost codes, rate tables and billing rules, then save that structure in project templates. Live projects are billed from the project record, either to a pro forma invoice for review or straight to an AR invoice, and the Project WIP reports show over- and underbilling. This guide gives administrators and controllers each step with the vendor’s form IDs, the common mistakes and the limits of the native feature.
How we researched this
We checked every vendor page on November 10, 2026. Acumatica’s own help portal blocks automated retrieval, so the steps cite the MYOB Acumatica online help, which MYOB publishes for its edition of the same platform with the same form names and IDs. Licensing comes from Acumatica’s October 2025 licensing guide. We also read the pages ranking for this search, including partner articles from Logan Consulting and SWK Technologies (both sell Acumatica). None gives the setup order, the billing formulas or the WIP adjustment process.
Before you start
- Edition. Project Accounting is included at every tier of the Construction and Professional Services Editions and is an optional add-on to General Business (Acumatica Licensing Guide, October 2025). Our guide to Acumatica pricing explains how editions and transaction tiers set your subscription.
- Construction features. Cost projections, WIP adjustments, retainage caps and AIA reports need the Construction feature that comes with the Acumatica Construction Edition. Services firms can follow every other step.
- Features on Enable/Disable Features (CS100000): Projects, plus Cost Codes, Construction and Approval Workflow as needed.
- Roles and prerequisites. Users with the Project Accountant role can deactivate cost codes (Cost Codes: General Information, no date shown), and the role has access to WIP adjustments by default (2025 R2 release notes, no date shown). Company settings and the other areas you integrate with projects, such as GL, AR and AP, must be set up first (Basic Project Configuration checklist, no date shown).
Step 1: Save the Projects Preferences
Open Projects Preferences (PM101000) > General tab and save the defaults first. Set the Non-Project Code (default “X”), the Empty Item Code (default “<N/A>”) and its unit (default HOUR), and choose in Visibility Settings which modules show the Project field (MYOB Acumatica help, no date shown).
Revenue Budget Update decides whether transactions create detailed budget lines by item or summary lines, the default, and Cost Budget Update works the same way for the cost budget. Budget Control decides whether users are warned when an entered document exceeds the project’s cost budget (Project Budget checklist, no date shown). Agree these with your controller before go-live.
Step 2: Build account groups
Account groups on Account Groups (PM201000) link the GL to project budgets. Income and expense groups appear on the Revenue Budget and Cost Budget tabs; off-balance groups track figures such as hours without posting to the GL. Each GL account can belong to only one group, and the vendor advises keeping AR and AP control accounts, retainage payable, purchase accruals and cash-linked accounts out (Account Groups: General Information, no date shown). Billing rules select transactions by group, so if labor and subcontract costs carry different markups, they need separate groups.
Step 3: Set up cost codes
Enable Cost Codes, modify the COSTCODE segmented key if needed so it fits your structure (for example a CSI MasterFormat division and section), then add codes on Cost Codes (PM209500) by hand or by importing an .xlsx or .csv file. The default cost code cannot be deactivated, and neither can a code on a budget line while its task is Active (Cost Codes: General Information, no date shown).
Since 2025 R2, default cost codes set on tasks, template tasks and items fill into commitments, time cards and project transactions (2025 R2 release notes, no date shown).
Step 4: Create rate tables for time and material work
For negotiated hourly or equipment rates, work through Rate Table Codes (PM204200), Rate Types (PM204100), Rate Table Sequences (PM205000) and Rate Tables (PM206000), where rates carry effective dates. A sequence defines which factors pick a rate (project, task, account group, item or employee), searched from the lowest number up. Billing formulas refer to the result as @Rate (Billing Rates: General Information, no date shown).
Step 5: Configure billing rules
On Billing Rules (PM207000), each rule holds steps with a Billing Type of Time and Material or Progress Billing (Project Billing: General Information, no date shown).
- Time and material. On the Calculation Rules tab, pick the account group and set the quantity, amount and description formulas. The vendor example bills material at cost plus 25% with =[PMTran.Amount]*1.25 and adds a second step for LABOR (vendor activity, no date shown).
- Progress billing. Set the line description to =[PMBudget.Description] so invoice lines match the schedule of values, and take the sales account from the account group (vendor activity, no date shown).
Clear Billing Settings tab > Create Lines with Zero Amount and Quantity unless customers want every line printed. Rules take effect only once assigned to tasks.
Step 6: Build project templates and common tasks
Project Templates (PM208000) hold GL accounts, billing period, visibility, tasks, employees and labor items with rates, and equipment. Project Template Tasks (PM208010) carry the approver, tax category and default accounts, and since 2025 R2 a default cost code; reusable tasks go on Common Tasks (PM208030). Settings copy to the project at creation, blank task settings fall back to the template, and only Active templates can be used (Project Templates and Common Tasks, no date shown).
The vendor says templates are not for classifying projects; use Project Groups (PM202500) for that. Build one template per contract type, such as lump-sum, cost-plus, fixed-fee and hourly, and set overbilling and underbilling accounts on the Defaults tab of construction templates (2025 R2 release notes, no date shown).
Step 7: Create the project, set budget levels and lock the budget
Create the project on Projects (PM301000) from a template. In Summary tab > Project Properties, set Revenue Budget Level and Cost Budget Level to Task; Task and Item; Task and Cost Code; or Task, Item, and Cost Code (Project Budget: General Information, no date shown).
Enter original amounts, then use More menu > Lock Budget: original quantity, rate and amount become read-only while revised columns stay editable (Budget Locking, no date shown). To manage scope changes as change orders, select Summary tab > Change Order Workflow and record them on Change Orders (PM308000) (Single-Tier Change Management, no date shown).
Step 8: Turn on pro forma invoices and run billing
Select Summary tab > Create Pro Forma Invoice on Billing on the project. Run Billing then creates an editable draft on Pro Forma Invoices (PM307000) that does not touch AR, and releasing it creates an invoice on Invoices and Memos (AR301000) (Pro Forma Invoices: General Information, no date shown). Run Project Billing (PM503000) bills many projects at once and shows whether each will produce a pro forma invoice or an AR invoice (Run Project Billing, no date shown). For progress billing, users enter Completed (%) on the Revenue Budget tab and the system calculates the amount:
| Item (illustration) | Value |
|---|---|
| Revised budgeted amount, sitework line | $200,000 |
| Completed (%) this period | 35% |
| Already invoiced (actual amount) | $50,000 |
| Pending invoice amount | $200,000 × 35% − $0 draft − $50,000 = $20,000 |
| Retainage at 10% | $2,000 withheld; $18,000 due |
These are our illustrative numbers; the formula is the vendor’s (Progress Billing: General Information, no date shown). Release pro forma invoices oldest first, because each can be released only after the prior AR invoice is released. Starting in MYOB Acumatica 2026.1.1 you can also create pro forma invoices directly on PM307000 (release notes, no date shown).
Contractors can cap retainage in the Retainage section of the Summary tab, release it on Release AR Retainage (AR510000) and print the AIA Report (PM644000) (Retainage with a Cap, no date shown). See our guide to progress billing and AIA forms.
Step 9: Set up cost projections and WIP reporting
Configure Cost Projection Classes (PM203500) to match your cost budget, or use date-sensitive projections on Cost Projection by Date (PM305500), which need no class (Cost Projections checklist, no date shown). Project WIP (PM651500) and Project WIP Detail (PM652500) show billings in excess of costs, costs in excess of billings, % complete, earned revenue and projected cost at completion, using released projections (WIP Reports, no date shown).
To post the result, set default accounts on Projects Preferences (PM101000) > WIP Adjustment Settings tab, then create a Project WIP Adjustment (PM305600), click Load Lines, review and release. The system posts an auto-reversing GL batch (2025 R2 release notes, no date shown). Our guide to construction WIP reports covers what sureties look for.
Common mistakes and how to fix them
- One GL account needed in two groups. Split the GL account instead, for example separate labor and subcontract cost accounts.
- Budget level too coarse. A Task-level project cannot report by cost code. Set the level on the template and test a full billing cycle before migrating open jobs.
- Templates used as categories. Use project groups for reporting and keep templates for real billing differences.
- Editing an AR invoice created from a pro forma. Its lines are read-only except the salesperson. Delete the unreleased AR invoice, fix the pro forma and release again.
- Stale cost projections. Make projection release a dated close step before the WIP adjustment.
Limitations of the native feature
A General Business customer with the Project Accounting add-on does not get the Construction tools above. Billing rule formulas are flexible but technical, so most firms need a partner or experienced administrator to write and test them. Estimating comes from partner products; the licensing guide lists Takeoff & Estimating, powered by STACK, as a Marketplace product.
When companies add a third-party tool
Contractors often keep Procore for field management; Procore documents an Acumatica integration that syncs cost codes and cost types, though that article sits in its legacy archive, so confirm the current connector (Procore Support, August 4, 2023). Services firms with heavy resource planning sometimes add a professional services automation tool and push approved time into Acumatica. Check 2026 R2 first: it adds parent and child projects with cost code rollups (Acumatica, October 8, 2026).
Related guides
- Acumatica Financials Setup: GL, AP, AR and Multi-Entity
- Acumatica Pricing 2026: Tiers, Licensing and Real Costs
- Acumatica Consultant Rates, Partners and Vetting (2026)
Frequently asked questions
Is project accounting included in every Acumatica edition?
No. The October 2025 licensing guide includes it in the Construction and Professional Services Editions and lists it as an optional add-on to General Business. WIP adjustments and cost projections also need the Construction feature.
What is the difference between a project template and a common task?
A project template (PM208000) sets up a whole project, including accounts, tasks, employees and rates. A common task (PM208030) is a reusable task that any project can add. Both copy their settings into the project when it is created.
Do I have to use pro forma invoices in Acumatica?
No. It is a project-level check box. Use it when a project manager or customer reviews the bill before it reaches AR, and leave it off for simple time and material work.
How does Acumatica calculate over- and underbilling?
The Project WIP report compares billings with earned revenue per project and task, using released cost projections for cost at completion. The Project WIP Adjustment document posts the result to the GL as an auto-reversing entry.
Should I budget by cost code or by task?
Contractors usually budget by task and cost code, because owners and field teams work in cost codes. Services firms often budget by task, with labor items supplying detail. Set the level on the template before go-live.
Sources
- Acumatica, Acumatica Licensing Guide, October 2025.
- Acumatica, Construction Edition datasheet, version 20260323 (March 2026).
- Acumatica, One Connected Project: How Acumatica 2026 R2 Delivers for Construction Firms, October 8, 2026.
- MYOB Acumatica help, Basic Project Configuration: Implementation Checklist, no date shown, checked November 10, 2026.
- MYOB Acumatica help, Project Budget: Implementation Checklist, Project Budget: General Information and Budget Locking, no date shown, checked November 10, 2026.
- MYOB Acumatica help, Account Groups: General Information, no date shown, checked November 10, 2026.
- MYOB Acumatica help, Cost Codes: General Information, no date shown, checked November 10, 2026.
- MYOB Acumatica help, Billing Rates: General Information, no date shown, checked November 10, 2026.
- MYOB Acumatica help, To Configure a Time and Material Rule and To Configure a Progress Billing Rule, no date shown, checked November 10, 2026.
- MYOB Acumatica help, Project Templates and Common Tasks: General Information, no date shown, checked November 10, 2026.
- MYOB Acumatica help, Project Billing: General Information and Progress Billing: General Information, no date shown, checked November 10, 2026.
- MYOB Acumatica help, Pro Forma Invoices: General Information and Run Project Billing (PM503000), no date shown, checked November 10, 2026.
- MYOB Acumatica help, Single-Tier Change Management: General Information, no date shown, checked November 10, 2026.
- MYOB Acumatica help, Retainage with a Cap: General Information, no date shown, checked November 10, 2026.
- MYOB Acumatica help, Project Cost Projections: Implementation Checklist and Construction Reports: WIP Reports, no date shown, checked November 10, 2026.
- MYOB Acumatica release notes, WIP adjustments (2025 R2), Cost Code Population (2025 R2) and Direct Creation of Pro Forma Invoices (MYOB Acumatica 2026.1.1), no date shown, checked November 10, 2026.
- Procore Support, Acumatica construction integration: cost code list, last modified August 4, 2023 (legacy archive). Procore sells construction management software.